Re-Commissioning After Performing Maintenance - Buderus SU54/5 Instrucciones De Instalación Y De Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9
Maintenance
9.4

Re-commissioning after performing maintenance

CAUTION: Risk of tank damage from a faulty gasket!
▶ To prevent the DHW tank from leaking, install a new
cleanout cover gasket upon completion of cleaning
and maintenance.
▶ Put the cleanout cover [4] back in place (top or side) together with the
new gasket [2].
▶ Thread hex bolts [5] into cleanout cover [4] "hand-tight".
▶ Then use a torque wrench to tighten the hex bolts to 18-22 lbf-ft
(25 - 30 Nm).
▶ Fill the DHW tank and restart the heating system.
▶ Check all connections and the inspection port for leaks.
▶ Replace the cleanout cover shroud.
▶ Reposition the PS top cover on the tank.
Fig. 22 Reassembling the inspection port
[1]
Inspection port
[2]
Cleanout cover gasket
[3]
Magnesium anode
[4]
Cleanout cover
[5]
Hex bolts
[6]
Cleanout cover shroud
16
6720 800 155-06.1ITL
SU54/5, SU80/5, SU100/5 – 6 720 808 532 (2013/08)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Su80/5Su100/5

Tabla de contenido