Duct Cover Installation; Install Accessories; Final Assembly - KOBE RA-02 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Duct Cover Installation

6. Use 8" round steel pipe (follow building codes
in your area) to connect the ducting transition
on the hood to the ductwork above. Use duct
tape to make all joints secure and air tight.
Refer Figure 7.
7. Use four 3/16" x 3/8" screws (included) to attach
duct cover to hood. Refer to Figure 8.

Install Accessories

8. Attach oil tunnel. Refer to Figure 9.
9. Refer to Figure 10.
the hood.
Push the baffle filter upward.
Slide forward.
Pull downward.
place.
10. For bottom casing, repeat above steps. Refer
to Page 15.

Final Assembly

11. Turn power ON in control panel.
lights and fan operation.
12. Make sure to leave this manual for the
homeowner.
All manuals and user guides at all-guides.com
Slide the baffle filter into
Fit into
Check all
8
Figure 8
Figure 9
Figure 10

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ra0230sqbRa0236sqbRa0242sqbRa0248sqb

Tabla de contenido