Prepare the analyzer for a long-term shutdown (more than 1 week) as follows:
Items supplied by user:
• Small container, 250 mL or larger
• Deionized water, 1.5 L
• Clean, no-lint cloth
Items to collect:
• Storage bottles for electrodes (2x)
• Protective caps for electrodes (2x)
• Black cover for glass junction of reference electrode
3.9.1 Drain and rinse the KCl electrolyte reservoir
Refer to the illustrated steps that follow.
Put on the personal protective equipment identified in the safety data sheet (MSDS/SDS).
12 English