Lay The Supply Lines - Waeco CA-800-DAF Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
CA-800-Install.book Seite 31 Mittwoch, 4. Juli 2007 3:05 15
CoolAir

6.2.6 Lay the supply lines

Make sure there is no voltage at electrically operated components before
carrying out work on them!
It is standard that the system has a 3.5 m long 4 mm
longer cables, the cable cross section must be increased by an authorised
workshop:
Cut off the 4 mm
and then make a proper connection to a larger cable cross section.
WAECO recommends a cross section of 6 mm
6 m.
Fit a fuse of at least 25 amps to the connection with the vehicle's power
supply.
The roof air conditioner must be connected to a battery that is able to sup-
ply the required current (see chapter "Technical data" on page 36).
You can connect the system directly to both the HGV's multiplier and the
battery. However, connection to the multiplier is preferable. Ask your vehi-
cle manufacturer for the specifications of the multiplier.
➤ Lay the supply cable and connect it to the vehicle (red cable to plus
➤ Plug the supply line plug into the socket in the roof air conditioner.
➤ Secure the supply line with a cable binder (see fig. 9 on page 6,
All manuals and user guides at all-guides.com
2
cable as closely as possible to the device (max. 0.5 m)
and black cable to minus).
Pos. 1).
Installation
2
cable. If you require
2
from lengths of 3.5 m to
31

Publicidad

Tabla de contenido
loading

Tabla de contenido