8. Supply Connections
Connect the supply tubes to the handle valve (inlets) and then the
supply stops. (Left is hot - right is cold.)
Tighten all connections.
9. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Remove the aerator. Point the spray nozzle down.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn valves
off.
Turn off the water.
Remove any debris from aerator and reinstall.
116371-2-AB
All manuals and user guides at all-guides.com
Faucet Supply
Supply Tube
Slip Nut
Supply Stop
10
Kohler Co.