INSTALLATION AND GETTING STARTED
1) Unpack the machine and check that it is in perfect condition; notify the shipper and supplier of
any damage. Note any reserves on the shipping order, which should be countersigned by the
deliveryman and confirm them to the shipper by registered mail with acknowledgement of
receipt.
2) Set the machine on a flat surface and make sure it is levelled.
3) Unscrew the 4 screws on the panel. Remove the panel
4) Take out the water pump located above the grey plastic tank after disconnecting it from the
electric plug. Fill the 18 litres tank with water. Put the water pump back in place and close the
front panel. Cover the screw holes with the plastic plugs.
5) Raise the cover and remove the arm fastener.
6) After checking that the mains voltage is the same as that marked on the black plate, plug the
cord into a standard 10/16 A grounded wall outlet.
10
SERIE3