Manage Cables - Cable Tunnel
NOTES:
●
This product is NOT recommended for brick,
plaster, or wallpapered walls.
●
If wall has been painted, allow paint to cure at
least 30 days before installing cable tunnels.
●
Wipe away any dirt, dust, grease, etc. on the
surface and let dry completely before installing.
●
The tunnels
17
can be painted to match your wall.
●
The tunnels
can be cut to fit the length
17
required.
To Remove Adhesive Clips
1.
Insert a flat object (e.g. - knife blade) behind the
clip and the adhesive pad and pry off the plastic clip.
2.
Peel off the adhesive pad with your fingers.
3.
If adhesive residue remains, use a cloth soaked in
an organic solvent to wipe away the residue.
NOTE: First test the solvent in a concealed spot to
make sure it will not damage the wall surface.
18
All manuals and user guides at all-guides.com
1
Space clips
evenly along the length of the tunnel(s)
15
with a clip near each end. To combine tunnels, use the long
clip
to connect where they meet.
16
A
Press firmly until clips snap in place.
B
Peel off backing of adhesive pads on clips.
NOTE: If using two tunnels, install five clips - four
clips and one long clip
16
If using only one tunnel, install three clips
TIP: If the edges of the two tunnels do not align, reverse
one tunnel end for end.
15
A
.
.
15
16
15
B
17
15