SANUS VuePoint FLF322 Manual De Instrucciones página 22

Tabla de contenido

Publicidad

Manage Cables - Cable Tunnel
NOTES:
This product is NOT recommended for brick,
plaster, or wallpapered walls.
If wall has been painted, allow paint to cure at
least 30 days before installing cable tunnels.
Wipe away any dirt, dust, grease, etc. on the
surface and let dry completely before installing.
The tunnels
17
can be painted to match your wall.
The tunnels
can be cut to fit the length
17
required.
To Remove Adhesive Clips
1.
Insert a flat object (e.g. - knife blade) behind the
clip and the adhesive pad and pry off the plastic clip.
2.
Peel off the adhesive pad with your fingers.
3.
If adhesive residue remains, use a cloth soaked in
an organic solvent to wipe away the residue.
NOTE: First test the solvent in a concealed spot to
make sure it will not damage the wall surface.
18
All manuals and user guides at all-guides.com
1
Space clips
evenly along the length of the tunnel(s)
15
with a clip near each end. To combine tunnels, use the long
clip
to connect where they meet.
16
A
Press firmly until clips snap in place.
B
Peel off backing of adhesive pads on clips.
NOTE: If using two tunnels, install five clips - four
clips and one long clip
16
If using only one tunnel, install three clips
TIP: If the edges of the two tunnels do not align, reverse
one tunnel end for end.
15
A
.
.
15
16
15
B
17
15

Publicidad

Tabla de contenido
loading

Tabla de contenido