620Rea And 620Re4A Loadsure Tube Element Loading - Watson Marlow Pumps 620RA Serie Manual Del Usuario

Tabla de contenido

Publicidad

Pre-load checks
Before loading tubing, ensure that all rollers rotate freely, that the tube ports and location grooves
l
are clean and that if in use, the controlled waste pipe work is free of any obstructions.
Closing the pumphead guard and start-up
Ensure no debris, loose fastenings or other foreign objects are in
pumphead before start-up. Failure to do so may result in an explosion
hazard.
Ensure that the guard seal is clean, replacing it if necessary.
l
Ensure that the rollers are engaged and locked out against the tubing
l
Ensure the latch mechanisum is free of any obstructions.
l
Close the guard and push it against the track until the latch engages.
l
Connect suitable pipe work to the pumphead using the appropriate connectors.
l
14

620REA and 620RE4A LoadSure tube element loading

620REA element pumpheads are factory set to accept Watson- Marlow LoadSure tube elements.
l
Pumping performance will be adversely affected if LoadSure elements are not used
Disengage rollers
l
Locate one of the "D"-shaped flanges into the lower port. (The "D" flange ensures that the element
l
can only be loaded correctly)
Wrap the tube element around the disengaged rollers of the rotor.
l
Locate the second "D"-shaped flange into the upper port
l
Ensure the flat face of each "D" flange sits flush to the flange sealing face of the track
l
Engage rollers
l
Close the guard and push it against the track until the latch engages.
l
PB0347:m-620atex-en-03
26

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

620rea serie620re4a serie

Tabla de contenido