P
OWERWARE
NOTE The following procedure is for an IBM
representative (see page 4).
Step 1. UPS Setup
Qty.
Powerware Part Number Description
2
—
4
—
2
—
4
—
1
157604171-001
1
157604171-002
4
—
8
—
2
157604172-001
4
—
1
164201357
1
05147305
1.
Attach the supplied mounting handles to the
mounting brackets.
Align the mounting brackets with the screw holes on
the side of the UPS and secure with the supplied
screws.
NOTE The UPS and Extended Battery Modules MUST be
installed at the bottom of the rack. If placed in a rack with
existing equipment, the rack must be reconfigured to allow
the UPS installation at the bottom of the rack.
NOTE The EBMs must be installed below the UPS.
2.
Install the clip nuts over the holes on the back of the
rack.
NOTE The clip nuts for the first set of rails go over the holes
in position 2 and 4. If you are installing additional rails, the
next set of clip nuts should be placed 4 and 6 holes above the
last installed clip nut.
Powerware
5125 (9910 P18) Quick Start for IBM
®
All manuals and user guides at all-guides.com
5125 (9910 P18) Q
IBM A
FOR
PPLICATIONS
9
pSeriesZ rack only. If you have another type of rack, contact your service
Mounting Handles
Mounting Handle Screws
Mounting Brackets
Mounting Bracket Screws
Left Fixed Mounting Rail Assembly
Right Fixed Mounting Rail Assembly
10-32 Clip Nuts
10-32 1/22 Pan-Head Screws
Rear Hold-Down Brackets
10-32 1/22 Flat-Head Screws
Powerware 4-Post Rail Kit User's Guide
Powerware 5125 Two-in-One (1000–1500 VA) User's Guide
Applications : 164201421 A
®
S
UICK
TART
Position 10
Position 10
Second Set of Clip Nuts
Position 8
Position 4
First Set of Clip Nuts
Position 2
1