EN
TOUCH&STEAM OPERATING AND MAINTENANCE MANUAL
5
OPTIONAL EXTRAS
If the optional RGB colour-therapy light fitting, the white light fitting and the external control panel have been
fitted to the Touch&Steam generator, the START-UP sequence must be run during installation.
The purpose of this sequence is to synchronise all the installed elements (generator, control panel, lighting).
Once this sequence has been run, all the functions of your Hammam/Turkish bath will be easy to run from the
control panel.
The start-up sequence needs only be repeated after additional optional EFFEGIBI features have been added
at a later date.
Make sure that the steam generator is connected to the electricity and water supplies.
If there is also a second optional external panel, the start-up sequence must only be run from the Touch&Steam
steam generator.
Switch on the panel by pressing the "ON/OFF" button (fig. A).
fig. A
The panel will display all the icons with a dim light.
Temperature button 6, the maintenance signal and the EFFEGIBI logo will all glow with a bright light (see fig.
B).
fig. B
14
The data and features referred to are not binding on EFFEGIBI and the company reserves the right to make any appropriate changes
without having to give prior warning or replace this manual.