Descargar Imprimir esta página

ShelterLogic 62680 Manual De Instrucciones página 7

Ocultar thumbs Ver también para 62680:

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Door AnD SolID enD PAnel InSTAllATIon
A. Hold end panel at the top center with white inner surface facing inside of the shelter. Wrap the edges of the
fabric panel around the end rib.
B. Disconnect top rail from the end rib. Pass the top cross rail through the gap in the fabric, in between the
webbing and rib frame. Re-attach top cross rail to end rib. Repeat Step B for side cross rails.
C. At the bottom, where the webbing exits the pocket on each side of end panel, pull webbing to remove the
slack. Be careful not to pull the webbing through the other side of the webbing pocket.
D. Insert the "S"- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet
and pull tight. Wind the ratchet so that the webbing overlaps itself.
Position the end panel so that it is centered on the building before fully tightening the end panel.
E. Tighten ratchets, alternating from one side to the other, until the end panel is centered and tight.
Zipper Door Panels: Zippers must be closed when tightening end panel.
WrAP enD PAnel eDGeS To InSIDe oF FrAMe
InSIDe VIeW oF enD rIB
Thread Webbing Into Ratchet
ZIPPerS
WeBBInG
Webbing and Ratchets Securing End Panel
ToP croSS
rAIl
SIDe croSS
rAIlS
coVer
rAIl
Page 7
WrAP enD
PAnel eDGeS
To InSIDe oF
FrAMe
SIDe VIeW oF enD rIB
05-62680-0F

Publicidad

loading