Installing Components; Releasing The Shipping Lock; Platform Installation; Draft Shield Installation (120G Model) - OHAUS Scout Pro SPx123 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN-4

Installing Components

Releasing the Shipping Lock

On top of the balance, turn the pointer 90
degrees counter-clockwise to unlock.

Platform Installation

Balances with a rectangular platform are placed into the subplatform as shown and
rotated counter-clockwise until it locks. Round platforms are placed straight down
on subplatform.

Draft Shield Installation (120g Model)

Position the keyed draft shield on top of the balance and rotate it until it faces forward.

Security Bracket

A security bracket is provided at the rear of the balance allowing the balance to be
secured by an optional cable and lock accessory.
Locked
Position
Pointer
Unlocked
Position
Releasing the Shipping lock.
Platform Installations.
Installing Draft Shield.
SCOUT PRO

Publicidad

Tabla de contenido
loading

Tabla de contenido