Descargar Imprimir esta página

Operation - OZ Lifting Products OZ PREMIUM OZ200-CHOP Manual Del Operador

Polipasto de cadena de 0.5 hasta 30 toneladas

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation

Warnings & Precautions
Hoist operators should read and fully comprehend this entire manual and all warnings on the hoist before
beginning hoist operation. If this manual is not read and followed completely injuries may occur.
Operator Requirements:
Read and fully comprehend this entire manual before hoist operation.
Must be trained in proper hoist operation and dealing with potential malfunctions.
Should not operate hoist while under influence of alcohol, medications, or drugs. Should not operate the
hoist while tired or distracted.
Should not operate hoist if they have a history of seizures or other medical issues that may interfere with
hoist operation.
Should have proper coordination and vision.
Prior to Operation be sure:
Hoist is clean and properly lubricated.
Hoist is in proper working condition and maintenance records are up to date.
Brake is functioning properly.
Area of operation is clear of flammable materials.
During Hoist Operation:
Maintain secure footing to prevent slipping and injury while operating.
Confirm that hoist unit is attached securely to a support before operation.
Verify hook latches are not supporting any of the load.
Do not hold the chain during hoist operation.
Slowly take up the load, verifying it is well supported and balanced before proceeding.
Feet of hand chain to lift one foot of load chain
1/2 ton. . . . . . 32ft.
1 ton . . . . . . . 52ft.
1.5 ton. . . . . . 67ft.
2 ton . . . . . . . 88ft.
3 ton . . . . . . . 133ft.
5 ton . . . . . . . 192ft.
10 ton . . . . . . 384ft.
EN pg.9

Publicidad

loading