Kalorik USK CCG 19322 Manual De Instrucciones página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Fax +32 2 359 95 50
To check or to modify the programming time, press the PROG
button twice until TIMER appears and it will be displayed. You can
now modify it as you like.
When your appliance will start at the set time, the green pilot light
will go out and the red ON/OFF pilot light will come on, indicating
that the brewing process has started.
You can switch off your appliance anytime simply by pressing the
ON/OFF switch until all pilot lights are off.
When you remove the jug from the appliance, a non-drip valve
will automatically operate to stop any drops of coffee dripping
onto the hotplate. Replacement of the jug automatically opens
the non-drip valve and allows remaining coffee to filter trough
into the jug.
Once the water tank is empty, we advise you to wait until the
brewing process is finished and the filter has run empty before
removing the jug.
Copies of the I/B. Please reproduce them without any
changes
except
under
International BELGIUM. The pages must be reproduced and
folded in order to obtain a booklet A5 (+/- 148.5 mm width x
210 mm height). When folding, make sure you keep the good
numbering when you turn the pages of the I/B. Don't change
the page numbering. Keep the language integrity.
12
Assembly page 12/32
special
instruction
from
USK CCG 19322 - 080626
Team

Publicidad

Tabla de contenido
loading

Tabla de contenido