Fax +32 2 359 95 50
•
Close the lid of the coffee grinder, making
sure the lugs of the lid insert in the slots of
the appliance. The lug should end up in
front of the
symbol located on the
appliance.
•
The brewing will start immediately after the
grinding of the coffee. Therefore, make sure
you proceed as indicated in the "MANUAL
OPERATION" section, or the
"PROGRAMMING THE COFFEE MAKER"
section of this user manual.
HINT: when the lid of the water tank and coffee grinder is left open,
beeps will sound and "OPEN" will be displayed on the screen to
remind you that the appliance cannot work with the lid open. We
therefore advise you to fill the water tank and the coffee grinder
before plugging in the appliance.
Copies of the I/B. Please reproduce them without any
changes
except
under
International BELGIUM. The pages must be reproduced and
folded in order to obtain a booklet A5 (+/- 148.5 mm width x
210 mm height). When folding, make sure you keep the good
numbering when you turn the pages of the I/B. Don't change
the page numbering. Keep the language integrity.
9
Assembly page 9/32
special
instruction
from
USK CCG 19322 - 080626
Team