SIT 845 GAS valve
Key:
1 - Coil
2 - Minimum power adjustment nut
3 - Maximum power adjustment nut
4 - Gas valve outlet pressure point
5 - Gas valve inlet pressure point
6 - Protection hood
Heating switch-on delay request from room
thermostat and remote control. The boiler is
set to switch-on immediately after a request. In
the case of particular systems (e.g. area systems
with motorised thermostatic valves etc.) it could
be necessary to delay switch-on.
Heating switch-on delay request from
room thermostat and remote control (P8)
Range of values which can
be set
0 - 20 (0 - 10 minutes)
(01 equals 30 seconds)
DHW ignition delay. This function does not
affect the correct functioning of this boiler
model.
Solar mode (P9)
Range of values which can
be set
0 - 20 seconds
Gas type selection. The setting of this function
is used to adjust the boiler in order to function
with the correct type of gas.
To access this regulation, once having entered
the programming mode, press the button (2)
for 4 seconds. To exit, press button (2) again
4 seconds.
Gas type selection (G1)
Range of values which can
be set
nG - Methane
lG - LPG
Ci - China
Ignition power (G2)
Range of values which can
be set
0 - 70 %
3.6 CONVERTING THE BOILER TO
OTHER TYPES OF GAS.
If the boiler has to be converted to a different gas
type to that specified on the data plate, request
the relative conversion kit for quick and easy
conversion.
Boiler conversion must be carried out by a
qualified technician (e.g. Immergas After-Sales
Technical Assistance Service).
To convert to another type of gas the following
Parameter
operations are required:
- remove the voltage from the appliance;
0
(0')
- replace the main burner injectors, making sure
to insert the special seal rings supplied in the
kit, between the gas manifold and the injec-
tors;
- apply voltage to the appliance;
- use the boiler push button control panel to
select the gas parameter type (G1) and select
(Ng) in case of Methane supply or (Lg) in the
Standard
case of LPG;
setting
- adjust the boiler nominal heat output;
- adjust the boiler minimum heat power;
0
- adjust the boiler nominal heat output in heating
phase;
- adjust (eventually) the maximum heating
power;
- seal the gas flow rate regulation devices (if set-
tings are modified);
- after completing conversion, apply the sticker,
present in the conversion kit, near to the data-
plate. Using an indelible marker pen, cancel the
data relative to the old type of gas.
These adjustments must be made with reference
Standard
to the type of gas used, following that given in
setting
the table (par. 3.18).
The same
as the type
of gas be-
ing used
Standard
setting
Set
according
to factory
inspection
VK 4105 M GAS valve
3.7 CHECKS FOLLOWING
CONVERSION TO ANOTHER TYPE
OF GAS.
After making sure that conversion was carried
out with a nozzle of suitable diameter for the
type of gas used and the settings are made at the
correct pressure, check that:
- there is no flame in the combustion chamber
- the burner flame is not too high or low and that
it is stable (does not detach from burner)
- the pressure testers used for calibration are
perfectly closed and there are no leaks from
the gas circuit.
N.B.: all boiler adjustment operations must be
carried out by a qualified technician (e.g. Immer-
gas After-Sales Technical Assistance). Burner ad-
justment must be carried out using a differential
"U" or digital type manometer connected to the
gas valve outlet pressure point (part. 4 Fig. 3-3),
keeping to the pressure value given in the table
(Par. 3.18) according to the type of gas for which
the boiler is prepared.
ES
PL
TR
CZ
SI
Fig. 3-3
HU
RU
RO
IE
SK
UA
155