Installation Checklist And Test Run - mabe MMI12CABWCCE8 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

C. Additional refrigerant amount charged in the field.
D. Total refrigerant charge.
E. Outdoor unit.
F. Refrigerant cylinder and manifold for charging.
installation check and test run
Gas leak from pipe connections?
Heat insulation of pipe connecting?
Are the connecting wirings of indoor and outdoor firmly inserted
to the terminal block?
Is the connecting wiring of indoor and outdoor firmly fixed?
Is drainage securely carried out?
Is the ground line securely connected?
Is the indoor unit securely fixed?
Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating performed normally?
Is the operation of room temperature regulator normal?
87

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido