3. INSTALLATION AND ASSEMBLY
The unit must not be moved from its standard vertical position, If it is not indicated, you cannot overturn. You have to wait least 2 hours
since placed upright to its implementation.
You are advice to unpack the unit standing on a solid, flat and stable surface. In order to transfer it to the installation location, a trolley or
fork-lift may be of help. It should not be dr4agged along the ground and always watch out to ensure it is not off-balance.
Next, remove the packaging to leave the unit completely free of all coverings and packing material, whilst avoiding knocks to the appliance,
scratching it or unscrewing the feet.
Once place in its final location, it should be pulled away from the wall so that there is a space of 7 cm at the back and a minimum of 7 cm to
the sides.
FIRST CLEANING
First of all, remove the protective film from stainless steel using any non-sharp object. Remove also possible glue remains using alcohol.
Avoid completely the use of tools or elements that may be able to scratch or damage the unit. Once cleaned and dry, assemble accessories
on correspondent places.
We recommend a regular cleaning of the stainless steel with some neutral soap, warm water and sponge, drying it afterwards. DO NOT
USE ANY DETERGENTS, ANY PRODUCT CONTAINING CHLORIDE, SULPHIDE OR ANY OTHER ABRASIVE AGENTS. ALWAYS
KEEP ELECTRIC PARTS AWAY FROM WATER.
ATTENTION
Please do not use iron, nickel sponges to clean STAINLESS STEEL or leave them lying on the surface as the iron deposits can stick and
cause the formation of rust contamination, thus jeopardising the hygiene of the surface.
PIPING CONNECTION
It is recommended that the connection of the piping, both for liquid and for carbon, is carried out by specialized personnel.
It must ensure all possible areas of leakage, both liquid and gas, with clamps and check their tightness, one by one, once the installation is
complete.
It must select the location of the unit so that the distance between the unit and the point of dispensing is minimal.
It requires that the electrical installation of the local meets with the features of the board of features of the machine.
FILLED THE TUNK
The tank should be filled with water; the water level should cover the last line of copper coil and be about 10mm below the overflow. During
the first connection of machine can spill into the overflow a small amount of water, this is due to the formation of ice in the tank.
It is very important not to manipulate ice thickness probe because a misplacement can cause the coil fluid freezes and cause severe
operational problems. Once filled the unit, keep upright.
As an aid, we attached table with approximate capacity of the tanks of the various coolers.
CAUTION: Do not store explosive substances in this unit as aerosol cans with a flammable propellant.
LIQUID COOLER
VERTICAL
V/H/VP-30
V/H/VP -50
V/H/VP -100
V/H/VP -200
V/H/VP -300
V/H/VP-400
TANK CAPACITY
13 L
25 L
42 L
72 L
86 L
110 L

Publicidad

loading

Este manual también es adecuado para:

HVp