Assembly; Assembling The Blower Pipe And Control Handle - Zenoah EBZ5100 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 62
Assembling the blower pipe and
control handle
Connect the blower and control pipe with the flexible
hose. Clamp both ends of the flexible hose in place.
Use the accompanying hardware.
1
3
1
Flexible hose
2
Control pipe
3
Clamp
4
Clamp
Note: Lubricate the pipes a little to facilitate assembly.
Fasten the handle holder to the control pipe and
tighten the knob on the holder. Please make sure to
align the handle holder with the convex of the control
pipe.
1
Handle holder
2
Control pipe
3
Knob
Adjust the position and angle to achieve a comfortable
working position, and tighten.
Use the clamp to fasten the cabling to the flexible
hose.
1
Clamp
2
Cabling
3
Flexible hose
112 – English

ASSEMBLY

2
4
Blower pipe
Assemble the intermediate pipe to the control pipe, then
attach the blower nozzle to the intermediate pipe. It is
possible to add more intermediate pipes (not included in
box) if longer blower pipe are required.
The blower nozzle can only be connected to the
intermediate pipe.

Publicidad

Tabla de contenido
loading

Tabla de contenido