OVE ARUBA Manual Del Usuario página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Secure the wall tracks (B & B1) using screws (HH), fittings (FF) and caps (EE).
2. Install the 2 glass panels vertical seal strips (P & P1).
3. Install the door's vertical seal strip (R) on the closing end.
4. Add some silicone into the corner track (Z), then insert the corner track (Z) into the side panel (K).
5-6. Insert the top cover (X & Y) into the tracks (B & B1 & Z), make sure the top cover (X) is hung onto the
fixed panel's bracket (G).
7. Using silicone, install the decorative track (U) in front of the door panel. Slide the decorative caps (T) onto
the track.
1
&
B
FF
HH
EE
3
J
5
Y
X
Z
DOOR PANEL INSTALLATION
B1
R
K
6
X
G
15
2
P1
C
P
J
4
K
Z
7
T
U
T

Publicidad

Tabla de contenido
loading

Tabla de contenido