Spline
Adapter
Valve
Stem
4. Install the Handles
Close the valves (hot = clockwise, cold = counterclockwise).
Apply a ring of plumbers putty or other sealant around the
underside of the escutcheon according to the manufacturer's
instructions.
Thread the escutcheon onto the valve body. Securely hand
tighten.
Remove any excess putty or sealant.
Position the spline adapter onto the valve stem.
Press the insert into the underside of the lever handle.
Align and install the lever handle onto the valve stem.
Secure with a screw.
Press the plug button into the handle.
1012558-2-B
Plug
Button
Lever
Screw
Handle
Insert
Escutcheon
Plumbers
Putty
Valve
Body
6
Kohler Co.