IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or
combined installation.
PREPARE THE OPENING
Installation over a GE Appliances/Monogram
Oven and Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not
obstruct the required interior depth and height. See
Warming Drawer installation instructions for details.
For personal safety, the mounting
CAUTION
surface must be capable of
supporting the cabinet load, in addition to the added
weight of the oven and drawer, plus additional oven
loads.
PREPARE THE OPENING (cont.)
Installation beside another GE
Appliances/Monogram Built-in Speedcook
Oven:
• If you are mounting one Under-the-Counter GE
Appliances/Monogram oven beside the other,
use the dimensions shown. The middle rail
separating
the two openings may need to be larger than
the 4-1/2 minimum shown.
REMOVE THE PACKAGING
• Lift the oven out of the carton.
• Remove all packing material and tape.
Standard Installation Preparation
(CONT.)
27" or 30"
17-1/2"
45-1/4"
25-1/4
17-1/2
• Open the door and remove parts box.
• Locate parts package containing mounting screws.
6
Construct
solid bottom
23-1/2"
- Min. 3/8"
plywood
supported
on all four sides.
Must be able to
25-1/4"
support weight
of oven and
contents.
2 Min.
(3 Recommended)
Per Oven
Requirement
2 Min.
(3 Recommended)
Per Warming
Drawer
Requirement
23-1/2
25-1/4
17-1/2
4-1/2 Min.
(5-1/2 Recommended)