Kohler Finial K-318 Guia De Instalacion página 7

Ocultar thumbs Ver también para Finial K-318:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Install the Towel Bar
Start a setscrew into each post. Do not thread fully into the post.
If included, place an escutcheon on both the left and right side wall
plates.
NOTE: The escutcheons are loose until the posts are in place and the
setscrews are tightened.
Align the towel bar assembly over the wall plates. Slide the
assembly onto the wall plates.
Tighten the setscrews with a hex wrench.
Kohler Co.
7
1020818-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido