Die Installation - Greenlee GATOR Operación Manual

Ocultar thumbs Ver también para GATOR:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Die Installation

Installing K22, KA22, and KC22-type Dies
1. Push the die release button.
2. Slide the die into the crimping head until it "snaps"
into place.
3. Properly position the second die. Repeat step 2.
Installing W-type Dies
1. Push the die release button.
2. Slide the die adapter (Greenlee part number
50042920) into crimping head until it "snaps" into
place.
Note: The die adapters have the "D
additional dies are needed if the connector to be
crimped requires a "D
3. Repeat for the other adapter.
4. Press the locking flange and open the crimping
head.
5. Push the W-type die detent and slide the W-type die
into place
6. Repeat step 5 to properly position the second die.
Greenlee Tools, Inc.
Gator
Insulated Battery-Powered In-Line Crimper
®
" die profile. No
3
" die.
3
Preparing Cable
Follow the lug manufacturer's instructions for
appropriate cable strip length.
Crimping Direction
(evenly spaced)
First Compression
SIDE A
13
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
First Compression
Crimping Direction
SIDE B
(evenly spaced)
First Compression
SIDE B
Crimping Direction
SIDE A
(evenly spaced)

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ek622cvx

Tabla de contenido