GLW MC25 Manual De Instrucciones página 51

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION
4. Crimping cables
 Insert the cable (1) straight into the funnel guide
until it stops.
 Crimping and stripping works automatically.
 Pull out the cable (2) straight when the mc 25
has stopped.
Refer to chapter faults when operating
!
faults or unsuccessful crimping
occurs.
 Read counter (3) if required and set it to 0 with
the reset button (4).
5. Stop operation
 Read counter (1) if required.
 Turn off (position 0) the mc 25 with the mains
switch (2).
6. Daily maintenance
Disconnect the mains supply from the
mc 25 and open cover.
 Turn off (position 0) the mc 25 with mains
switch (1).
 Disconnect mains cable (2).
 Slide the cover (3) back.
 Remove (4) insulation scraps inside the mc 25.
 Pull out the container (5).
 Dispose insulation scraps and insert container.
 Close the cover (6).
 Connect mains cable (7).
10/12
Diagram 13
Crimping cables
Diagram 14
Stop operation
Diagram 15
Daily maintenance
13

Publicidad

Tabla de contenido
loading

Productos relacionados para GLW MC25

Tabla de contenido