Wiring the GRAFIK Eye
Important Wiring Information
• Use properly certified cable for all line
voltage/mains cables.
• Proper short-circuit and overload
protection must be provided at the
distribution panel. You can use up to a
20 A maximum circuit breaker/MCB for
your installation.
• Install in accordance with all local and
national electrical codes.
• PELV (Class 2: USA) terminals may be
unplugged for ease of IR, occupant
sensor, and control wiring.
Danger! GRAFIK Eye QS control units must be installed by a qualified electrician
in accordance with all applicable regulations and building codes. Improper
wiring can result in personal injury or damage to control units or other
equipment. Always turn off circuit breaker or remove main fuse from power line
before doing any work. To avoid overheating and possible damage to
equipment, do not install dimming devices to dim receptacles, motor-operated
appliances, or fluorescent lighting not equipped with Lutron Hi-lume
or Tu-Wire
electronic dimming ballasts, or devices approved for your location.
®
In dimmed magnetic low-voltage circuits, you can prevent transformer
overheating and failure by avoiding excessively high current flow: Do not operate
control units with any lamps removed or burned out; replace any burned out
lamps immediately; use only transformers that incorporate thermal protection or
fused primary windings. Control units are designed for residential and
commercial use, for indoor use only.
R
QS System
®
Caution! Before connecting the
loads to the control unit, test the
loads for short-circuits.
1.Turn power OFF at the circuit breaker or
fuse box.
2.Connect a standard light switch between
the live lead and load wire to test the
circuit.
3.Turn power ON and check for short or
open circuits. If load does not operate,
the circuit is open. If the breaker/MCB
trips (fuse blows or opens), a load short
may exist. Correct short or open circuits
and test again.
Hot/Live
Switch
Neutral
• Earth/ground terminal connection must
be made as shown in wiring diagrams.
• Do not mix different load types on the
same zone.
• Follow all local and national electrical
codes when installing PELV (Class 2:
USA) wiring with line voltage/mains
wiring.
• Test for short-circuits on loads before
wiring QS control unit.
To connect the line voltage/mains
cables to the control unit:
1.Strip
line voltage/mains cables in the wallbox.
Load
2.Connect the line voltage/mains, ground,
and load wires to the appropriate
terminals on the back of the control unit.
The recommended installation torque is
, Eco-10
,
®
TM
5.0 in.-lbs. (0.6 N•m) for line
voltage/mains connections and 5.0 in.-
lbs. (0.6 N•m) for the earth/ground
connection.
GRAFIK Eye
QS System Installation and Operation Guide 3
®
Caution! Do not connect line
voltage/mains cable to PELV
(Class 2: USA) terminals.
5
/
in. (8 mm) of insulation off the
16
5
/
in.
3/8 in. (10 mm)
16
(8 mm)