www.saniflowcorp.com
Following the above scheme, using the pencil, mark on the wall the top two holes of the changing station's
holding structure. It is very important to make sure that the locations marked with the pencil for the
mounting holes are at the same level before drilling the holes.
Installation according to ADA regulations.
If it is required that the installation complies with the ADA regulations (USA), the installation should be
made taking into account the following installation dimensions.
Step 3. Installation of the changing station's bed and holding structure on
the wall.
Installation on brick, masonry or cement wall.
Using the masonry bit, make the two previously marked 13/32" (Ø 10mm) holes for the top part of the
changing station, at a minimum depth of 2 3/4" (70 mm).
Clean the dust off the two holes and insert the two Ø10 mm nylon plugs into them.
Screw two of the Ø6.3x70 mm mounting screws into the two previously placed plugs, without reaching the
bottom, leaving a gap of about 7/32" (5 mm) between the screw head and the wall.
Hang the changing station's holding structure from the two previously placed screws, making sure that the
unit is perfectly levelled. When you have made sure that the changing station is perfectly levelled, tighten
the top two screws completely.
Use the four lower holes of the changing station's holding structure as a guide to mark the position of the
remaining four holes.
Loosen the upper screws and remove the changing station.
Using the previously made markings as reference, drill the four lower holes with the 13/32" (Ø 10mm) drill
at a minimum depth of 2 3/4" (70 mm).
.
-5-