KOBE CH-122 Serie Instrucciones De Instalación Y Manual De Operación página 13

Ocultar thumbs Ver también para CH-122 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

***This installation only applied with the purchase of a duct cover (Model No. CH1120DC).
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
- Use duct tape to seal the joints between pipe sections.
- If necessary, prepare back wall frame with cross framing lumber for secure installation.
- Using references on Table 2 and measurements on page 22-23, decide the level of the
lumber. Refer to Figure 14.
Hood Preparation before Installation
- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood and the duct cover (if any).
- Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.
6" Round Vent
STAND ALONE INSTALLATION – TOP VENT
Figure 13
7" Round Vent
11
Figure 14
Figure 15
3-1/4" x 10" Vent

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ch2230sqCh2236sq

Tabla de contenido