Reset The Production Control Board; Configuration; Operation Logic Configuration - Airzone AZX6CCPGAWI Guía De Instalación Rápida

Ocultar thumbs Ver también para AZX6CCPGAWI:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
Important: The following combinations will not generate air demand in the production control board:
-
Communication gateway (AZX6QADAPTxxx / AZX6QADAPT3xxx / AZX6GTC xxx / AZX6ELECTROMEC) in Flexa 3.0,
Innobus Pro6, Acuazone and Innobus Pro32 (v.4.4.0 or lower) main control boards.
-
Gateway modules (AZDI6MCIFR [C/R] / AZDI6MCxxx [C/R] / AZDI6ZMOxxx [C/R]) in Acuazone e Innobus Pro32 (v.4.4.0
or lower) systems (when configured as a zoning system or mixed system).
Important: To guarantee the optimization of the production temperature of the aerothermal units, these device combinations
do not generate demand to the production control board:
-
Zoning module for Electrical Heating Element (AZDI6MZSRE [C/R]) in Acuazone and Innobus Pro32 systems regardless
of the Main control board configuration.
SW1
Once all the main control boards have been addressed, you must save the configuration of the
installation in the production control board. To do that, press SW1. If you make any changes in the
installation, remember to save the new configuration.
SW2
The microswitch SW2 sets the type of installation to control by the central production control. The operation logic of the
microswitch is as follows:
Aerothermal
*Only for Airzone RadianT365 system (AZRA6).
Important: The control relays operation logic can be configured from SW2 or from the Production Parameters section on the
advanced configuration menu. Configuration from the menú always has priority over SW2.

RESET THE PRODUCTION CONTROL BOARD

Press and hold on SW1 until the LED D3 is off to return to factory settings.

CONFIGURATION

OPERATION LOGIC CONFIGURATION

Choose the configuration that best suits your needs.
Remember: In order to make changes in the configuration, it is necessary to disconnect previously the power supply of the production
control board.
Meaning
2 pipes
3/4 pipes
RadianT*
ES
EN
FR
IT
PT
DE
19

Publicidad

Tabla de contenido
loading

Tabla de contenido