Installation
Process C, continued.
4. HOLD THE PIPE, remove pipe
clamp and slide well seal over rigid
PVC pipe and onto well casing.
Position assembly so that twelve
inches of rigid PVC pipe protrude
from well seal. Alternately turn bolts
on well seal clockwise until rubber
gaskets are tight against well casing
and rigid PVC pipe.
5. Cement 1-1/4" PVC elbow onto
rigid PVC pipe protruding from well
seal. If desired, some length may
be cut off of rigid PVC pipe before
cementing elbow. Smooth the inside
of any rigid PVC pipe that has been
cut with a round file or knife.
6. If you are using the SDTS5-01 or
SDTS10-01 pump, thread a 1-1/4"
male PVC adapter into the front of it.
Hand tighten, then turn 1/4 turn with
wrench.
PRIMING SHALLOW WELL JET PUMPS
STEPS 7–12 ARE FOR THE
SD-520-01 AND SD-100-01
CONVERTIBLE PUMPS
7. Open ejector kit.
Thread one venturi
tube into ejector until
snug. Place gasket
over venturi tube
so that openings in
gasket line up with
openings in ejector.
NOTE: See kit instructions for correct venturi and
nozzle to install.
8. Slide bolts through the bolt
openings on either side of the
ejector, through the gasket and bolt
ejector to front of the pump. Tighten
bolts securely.
9. Thread a 1-1/4" male PVC adapter
into front of ejector. Hand tighten,
then turn 1/4 turn with wrench.
For parts or assistance, call Shur-Dri Customer Service at 1-800-535-4950
APPROX.
12" OF
PVC PIPE
PROTRUDING
FROM WELL
SEAL
WELL
SEAL
1-1/4"
PVC
ELBOW
TOP OF
PVC PIPE
PROTRUDING
FROM WELL
SEAL
BUSHING
1-1/4"
MALE PVC
ADAPTER
PUMP
VENTURI
GASKET
BOLTS
TUBE
EJECTOR
EJECTOR
1-1/4"
MALE PVC
ADAPTER
10. Cement
as many
sections and
couplings
of PVC pipe
needed to
connect the
PVC elbow to the 1-1/4" male PVC adapter in the front of
the pump.
11. Apply 2-3 wraps of teflon tape to
the male threads on the regulator
body. Using pipe wrench, thread
1" discharge tee into top of pump.
Remove pressure gauge plug from
top of discharge tee. TO PRIME:
Put a garden hose into top of
discharge tee and fill pipes and pump until water overflows
from top of discharge tee. This may take several minutes.
12. Thread pressure gauge plug back
into discharge tee and thread
pressure gauge into pressure gauge
plug. Make sure all connections
are tightly sealed.
13. Complete all electrical connections as on pages 2 and 3 in
the preinstallation instructions.
14. Screw 1" male PVC adapter
into discharge tee outlet.
15. Thread 10" x 1" nipple into
pressure tank. Thread tank
cross into nipple so that the
two 1/4" holes in tank cross
BOLT
face upward. Plug two outlets
on tank cross with two 1/4"
plugs.
16. Thread 1/2" boiler drain into
front of tank cross. Thread 1"
male PVC adapter into inlet
side of tank cross. Connect to
household plumbing.
5
1-1/4" PVC PIPE
PRESSURE
GAUGE
PLUG
DISCHARGE
TEE
PRESSURE
GAUGE
1" MALE PVC
ADAPTER
1/4" PLUGS
TANK
NIPPLE
CROSS
1/2"
BOILER
DRAIN
1" MALE
PVC ADAPTER