Plug
Pi
Signal
con-
n
nec-
tor
J900
1
RS485 Signal B -
/
2
RS485 Signal A +
J901
3
Ground
4
Ground
5
CAN Low
6
CAN High
Connection to the power grid
Installation of circuit breakers
Information
Circuit breakers are not included in the scope of sup-
ply and must be installed by a qualified electrician.
The energy manager has no internal fuses; conse-
quently the inputs for voltage measurement, the ex-
ternal voltage supply and the relay on the energy
manager must be secured with appropriate series
fuses.
–
Operation of the energy manager requires that all
supply cables be protected against overcurrent.
In this process, it is important to select fuses
with sensitive trip characteristics.
–
The selection of fuse elements is determined by
the commercially available components of the
relevant country of use.
–
Components with the lowest trip current and trip
time must be used.
Preparing the distributor cabinet
For information on the energy manager's space re-
quirements:
g Refer to chapter "Technical Data" on page 24.
e
Ensure 11.5 horizontal pitch on a DIN H-rail for
the installation of the energy manager within the
distributor cabinet.
e
Install the power pack of the energy manager
with a distance of at least 0.5 horizontal pitch to
its housing.
e
Protect all electrical interfaces from direct/indi-
rect contact.
Fig. 11 Preparing the distributor cabinet
11.5 horizontal pitch
A
9 horizontal pitch
B
0.5 horizontal pitch
C
2 horizontal pitch
D
Installation in the distributor cabinet
b All cable connections are connected to the en-
ergy manager.
b H-rail bracket on the housing of the energy man-
ager is unlocked.
1. Place the H-rail bracket on the H-rail in the dis-
tributor cabinet.
2. Tip the housing of the energy manager and fit it
flat on the H-rail.
3. Lock the H-rail bracket on the housing of the
energy manager.
15