Test Run; Before Test Run; Heating Operation - Toshiba Carrier MMU-AP0071YHPUL Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9

Test run

Before test run

Before turning on the circuit breaker, carry out the
following procedure.
1) By using insulation tester (500VMΩ), check that
resistance of 1MΩ or more exists between the
terminal block L to N and the earth (grounding).
If resistance of less than 1MΩ is detected, do not
run the unit.
2) Check the valve of the outdoor unit being opened
fully.
To protect the compressor at activation time, leave
power-ON for 12 hours or more for operating.
Before starting a test run, be sure to set addresses
following the Installation Manual supplied with the
outdoor unit.
Requirements for turning thermostat OFF
Cooling operation
When the outdoor/suction air temperature is lower than or equal to 66.2°F (19°C).
When the outdoor/suction air temperature is lower than or equal to 37.4°F (3°C) above the set temperature.

Heating operation

When the outdoor/suction air temperature is lower than or equal to 14°F (10°C).
When the outdoor/suction air temperature is higher than or equal to 59°F (15°C).
When the outdoor/suction air temperature is higher than or equal to 37.4°F (3°C) above the set temperature.
Execute a test run
When a fan operation is to be performed for an
individual indoor unit, turn off the power, short circuit
CN72 on the circuit board, and then turn the power
back on. (Set the operation mode to "fan" to operate
the unit.) When the test run has been performed
using this method, be sure to release the short circuit
of CN72 after the test run is completed.
Operate the unit with the remote controller as usual.
For the procedure of the operation, refer to the
Owner's Manual attached to the outdoor unit.
A forced test run can be executed in the following
procedure even if the operation stops by thermostat-
OFF.
In order to prevent a serial operation, the forced test
run is released after 60 minutes have passed and
returns to the usual operation.
CAUTION
Do not use the forced test run for cases other than
the test run because it applies an excessive load
to the devices.
35-EN
Field setting menu(1/2)
1.Test mode
2.Register service info.
3.Alarm history
4.Monitor function
5.Setting louver position
Return
Set
Field setting menu(1/2)
1.Test mode
2.Register service info.
3.Alarm history
4.Monitor function
5.Setting louver position
Return
Set
Test mode
Test mode start.
Return
Yes
No
(1)
Room A
12:00
Test
Cool
Mode
Fan Speed
(2)
Room A
12:00
Test
(3)
Test mode
Test mode stop.
Return
Yes
No
– 18 –
1
Push the [
MENU] button to display the menu
screen.
2
Push and hold the [
MENU] button and the
[
] button at the same time to display the
"Field setting menu".
→ Push and hold the buttons for more than 4 seconds.
3
Push the [
] / [
] button to select
"1. Test mode" on the "Field setting menu" screen,
then push the "
Set" [
F2] button.
→ Pushing the " Yes"
[
F1]
button sets the test mode
and the screen returns to the "Field setting menu"
screen.
Push [
CANCEL] twice, the screen (2) appears.
4
Push the [
ON / OFF] button to start the test
mode. The screen (1) shown in the left appears.
(The screen (2) appears when the operation is
stopped.)
→ Perform the test mode in the "Cool" or "Heat" mode.
→ Temperature setting cannot be adjusted during the test
mode.
→ Check codes are displayed as usual.
5
When the test mode is finished, push the
[
] / [
] button to select "1. Test mode"
on the "Field setting menu" screen, then push the
"
Set" [
F2] button.
The screen (3) appears.
[
F1]
→ Pushing the "
Yes"
button
stops the test mode screen and continues the normal
operation.
NOTE
The test mode stops after 60 minutes and the screen
returns to the normal / detailed display.
EN
FR
ES
36-EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mmu-ap0091yhpulMmu-ap0121yhpul

Tabla de contenido