All manuals and user guides at all-guides.com
USEFUL INFORMATION
•
Purchasing a new My NEEDO
Before starting the new and necessary binding procedure (radiator binding) the
powerbox network information must be reset: ATTENTION, in this case the reset
procedure differs from that shown on page 70 as it is necessary to perform it on
each single radiator while the power supply to the others is cut off.
They should only be switched on after all of them have been reset and they
should flash red/green.
Now My NEEDO can be switched on and you can begin the initial installation –
binding phase.
•
The radiator does not heat up
Verify that the radiator is receiving the correct power supply and that it is not
set to stand-by mode. If the problem persists, contact the Technical Assistance
72