6.3
Repair
> Before carrying out repair work, temporarily decommis-
sion the entire photovoltaic installation.
> Replace any defective components.
> Do not carry out any repairs in the connection box.
> Start up the photovoltaic installation again.
7
Inspection and maintenance
> Follow the inspection and maintenance plan in the
appendix.
> Temporarily decommission the photovoltaic installation.
7.1
Checking the insulation and stability of the
cabling
> Check the cabling, insulation and plug connections for
cleanliness, integrity and stability.
> Document and eliminate all faults.
7.2
Checking the end and middle clamps
> Check all of the end and middle clamps on the photovol-
taic modules to ensure that they are correctly connected
to the mounting frame and the PV module frame.
7.3
Checking the protective earthing
> Check the cabling of the protective earthing for cleanli-
ness, integrity and stability.
7.4
Completing inspection and maintenance
work
> Document the inspection work that was carried out in an
inspection report.
> Point out to the end user that they must always keep the
inspection report safe.
> Start up the photovoltaic installation again.
8
Decommissioning
8.1
Permanently decommissioning the
photovoltaic installation
> Observe the instructions for the inverter.
> Cover the photovoltaic modules with an opaque plastic
film or a fleece in order to minimise the generation of
direct current.
8.2
Removing the photovoltaic module
> Decommission the photovoltaic installation.
> Remove the photovoltaic modules and observe the infor-
mation on the electrical installation and set-up.
9
Technical data
385/6 390/6 395/6 400/6 405/6 410/6
M BBF
Nominal output P
385
390
nom
W
W
Voltage at P
U
31,21
31,40
max
mpp
V
V
DC
DC
Current at P
I
12,34
12,42
max
mpp
A
A
Short-circuit current
12,94
13,02
I
A
A
sc
Open circuit voltage
37,05
37,17
V
V
V
oc
DC
DC
Dimensions
(W x H x D)
Frame height
Weight
Frame material
0020329424_00
Installation and maintenance instructions
VPV P
M BWF
395
400
405
410
W
W
W
W
31,60
31,14
31,34
31,53
V
V
V
V
DC
DC
DC
DC
12,50
12,84
12,92
13,00
A
A
A
A
13,10
13,46
13,55
13,63
A
A
A
A
37,29
37,08
37,20
37,32
V
V
V
V
DC
DC
DC
DC
1752 x 1144 x 40 mm
40 mm
22 kg
Al
385/6 390/6 395/6 400/6 405/6 410/6
M BBF
Connections
Connection box (2, image 1) with three
bypass diodes, 4 mm² cable and MC4
plug connection. Length per pin: 1200
mm (+) (4, image 1) and 1200 mm (−) (3,
image 1)
Module efficiency
19,21
19,46
%
%
Current coefficient α
Voltage coefficient β
Power coefficient γ
Maximum permissible
system voltage U
max
Reverse current
capacity
Pressure load (design
load)
Pressure load
2
(dimensioning load)
Suction load (design
load)
Suction load (dimen-
sioning load)
2
Mechanical load in accordance with IEC/EN 61215:2021
1 Observe the installation conditions in the installation instructions
2 Design load/safety factor 1.5 = dimensioning load
This module is rated as application class A in accordance
with IEC 61730. The electrical performance data can be
found in the data sheet or on the data plate.
10 Inspection and maintenance work
– Overview
The table below lists the manufacturer requirements with
respect to minimum inspection and maintenance intervals. If
national regulations and directives require shorter inspec-
tion and maintenance intervals, you should observe these
instead of the intervals listed.
No.
Maintenance work
1
Checking the end and middle clamps
2
Cleaning the photovoltaic module
3
Checking the installation site
4
Checking the protective earthing
5
Checking the inverter
VPV P
M BWF
19,71
19,96
20,21
20,46
%
%
%
%
0,03 %/K
−0,26 %/K
−0,34 %/K
1000 V
DC
25 A
1
8100 Pa
1
5400 Pa
3600 Pa
1
2400 Pa
1
Interval
Annually
Annually
Annually
Annually
Annually
11
en