Descargar Imprimir esta página

Santec E Serie Instrucciones De Instalación página 12

Manija de instalacion independiente en el piso para la criteria de baneras

Publicidad

TRIM INSTALLATION INSTRUCTION
INSTRUCCIONES DE INSTALACIÓN DE TRIM
4
-Ensure the diverter knob is facing the tub. Place four
5mm Hex Bolts into the slots, one bolt for each slot, of the
rough bracket before installing the floor mount tub filler.
Temporarily suspend the flange to the mid section of the
floor mount tub filler by using tape so it does not get in the
way of installation.
Install the floor mount tub filler by inserting the HOT
and COLD supply tubes into the rough. Make sure the supply
tubes matches the same side as the rough's HOT and COLD
supply hose. Press down firmly to ensure supply tubes are
inserted into the rough for proper seal.
Use
a
long
straight
(not included) to tighten the 5mm Hex Bolts into the rough.
-Asegúrese
de
que
orientada hacia
la bañera. Coloque cuatro 5mm Tornillos
Hexagonals en las ranuras, un tornillo para
del soporte de la valvula antes de instalar el floor mount
tub filler.
Suspenda temporalmente la flange en la sección media del
floor mount tub filler mediante el uso de cinta adhesiva para
que no interfiera en la instalación.
Instale
el
floor
mount
de supplemento HOT y COLD en la valvula. Asegúrese de
que los tubos de supplemento coincidan con el mismo
lado que la manguera
Presione firmemente hacia abajo para asegurarse de que
los tubos
de supplemento
para un sellado adecuado.
Use una herramienta de llave allen larga y recta de 5mm
(no incluida) para apretar tornillos hexagonales de 5mm en la
valvula.
5mm
allen
wrench
la
perilla
del
desviador
cada
tub
filler
insertando
de
la valvula
HOT
se
inserten
en
tool
esté
ranura,
los
tubos
y
COLD.
la
valvula
10

Publicidad

loading