Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review
this manual before you start installation. If you encounter any installation or
performance problems, please don't hesitate to contact us. Our phone numbers and
website are listed on the back cover. Thanks again for choosing Kohler Company.
Before You Begin
CAUTION: Risk of personal injury or product damage. Handle with care.
Vitreous china can break or chip if the bolts and nuts are overtightened, or if the
product is handled carelessly.
Observe all local plumbing and building codes.
Carefully inspect the new bidet for damage.
The bidet must be installed with 3/8" hot and cold shut-off valves.
The drain outlet must exit through the floor.
Install the trap in the drain line below the floor.
Hot and cold supply locations should be installed from the floor.
A 6" (15.2cm) clearance from the wall to the back of the fixture is required to make
supply and drain connections.
Refer to the roughing-in book for dimensional information.
Site preparation may require additional tools and hardware.
1. Preparation
Turn the water supply off.
Install the hot and cold water supplies, shut-off valves, and trap outlet as necessary to
conform to roughing-in dimensions.
1020409–2–A
2
Kohler Co.