Transport; Unpacking/Initial Preparation - Baxi PRIME 1.24 Manual De Uso Destinado Al Usuario Y Al Instalador

Caldera mural de gas de condensación
Ocultar thumbs Ver también para PRIME 1.24:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 98
The Service label is at the base of the cover of the terminal block under the
control panel, as shown in the figure to the side.
• "Code": Product number
• "Product name": Name of model
• "s/n": Serial number
"Code"
"Product name"
"s/n"
BO-0000012
5.3.2
Ventilation (for type B devices only)
Install a ventilation system in the boiler room to permit extraction of the combustion air. The size and location of the ventilation
system must be in compliance with the domestic laws in force.
5.4

Transport

Transport the packed device horizontally using suitable equipment. It is permitted to transport the boiler vertically using a two-
wheeled trolley only over short distances.
Two people are required to handle the boiler.
5.5

Unpacking/initial preparation

Do not hold the appliance by the siphon when lifting it or removing it from the packaging.
Unpack the boiler as follows:
• Put the boiler in its upright position (1);
• Remove the straps and strip of tape (2)-(3)-(4);
• Remove the accessories (5) then fasten the boiler fixing bracket on the wall;
• Remove the polystyrene by pulling it upwards (6);
• Remove the cardboard by pulling it upwards (7);
• Remove the pre-cut polystyrene part from the bottom (8);
• "LIFT" the boiler holding it at points "a" and "b" (9);
• Attach the boiler to the bracket on the wall (9);
• Remove the polystyrene by pulling it downwards (10).
17
BO-0000011
7696306 (01-12/17)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Prime 26Prime 30

Tabla de contenido