Construct
2x4 or 2x6
stud framing.
1. Prepare a New Site
NOTICE: Measure your product for site preparation. Note the model number located on the back of the
bath, then visit the product page at www.kohlerwalkinbath.com for additional information.
Make sure the flooring offers adequate support for your bath. Verify the subfloor is flat and level.
Construct 2x4 or 2x6 stud framing.
Make sure the drain location corresponds to the bath outlet.
This bath is designed for below-the-floor drain installation. For below-the-floor drain installations
which will drain to the opposite wall, measure and cut a channel in the subfloor to accommodate
the drain pipe and fittings. Refer to the specification sheet.
Measure and cut the drain hole in the subfloor. Install the drain pipe.
IMPORTANT! Reverse the water supply lines if the pipes will be routed from the opposite wall.
Install the water supply lines according to the specification sheet.
Cap the water supplies, and check for leaks.
Kohler Co.
Position
the rough
plumbing.
Channel
Verify that the subfloor offers adequate
support, and is flat and level.
5
1267113-2-C