8. DELIVERY CHECK
14
1
2
3
4
EN
5
6
7
8
9
10
11
•
Check all safety devices of the door and if necessary readjust them.
•
Check all door functions against the checklist and sign off the completed list.
•
The Declaration of Performance must be completed by the technician.
Checklist
Location of the door:
1
Door plate
1.
Condition of door panel
2.
Attachment to door roller
3.
Attachment to bottom beam
4.
Welds in door panel
5.
Securing balls *
6.
Reinforcement profiles *
2
Bottom beam
7.
Guides
8.
Bottom seal *
9.
Break-Away *
3
Column
10. Securing the column on the wall
11. Securing consoles to the wall
12. Dents / scratches
13. Fixed side seal
40
This user manual must be handed to the customer and must be kept in a safe place throughout the whole period of use!
CHECK
Commissioned on:
4
approved
Drive
14. Attachment
15. Leaks
16. Engine brake (audible click)
17. Setting end positions
5
Tensioning and
balancing system *
18. Tension belt / elastic
approved
19. Fastening tension belt / elastic
20. Return pulleys
21. Roll-up disks
22. Tension spring *
23. Buckle loops *
approved
24. Buckle tightened *
Conformity
1
2
3
4
5
6
7
8
9
10
11
approved
approved