Installation Instructions - PYD Electrobombas MP Serie Manual De Instalación Y Mantenimiento

Ocultar thumbs Ver también para MP Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTRUCTIONS MANUAL AND MAINTENANCE
SERIE MP
DN INT (A)
MODEL
KW
Ø"
220V
(P
1
MP80
1
3,7
0,8
MP100
1
4,3
1,1
MP120
1
7,0
1,2

3. INSTALLATION INSTRUCTIONS

Before starting the pump:
- Make sure that the mains voltage and frequency are the same as on the rating plate.
- Make sure that the capacitor matches the pump motor requirements (for single-phase motors).
- Make sure that the pump is fully submerged (for submersible pumps).
- Check the direction of rotation.
- Never run the pump dry.
- Never change the position of the level switch set by the manufacturer.
It is recommended to install a pipe with a larger diameter than the pump drive to reduce friction
losses as much as possible.
Install a check valve at the pump outlet to prevent the pipe from draining every time the pump
stops. Avoid bends and turns in the piping and ensure a correct connection between the piping
and the pump drive. Both cases affect the correct operation and performance of the pump.
www.proindecsa.com / proindecsa@proindecsa.com
3
m
l/min
POWER
CON
KW
Hp
µF
)
(P
)
(P
)
2
2
0,55
0,75
16
0,75
1,00
20
0,90
1,20
20
MODELO
A
MP80
177
382
MP100
200
405
MP120
223
428
FLOW
/h
0
0,6
1,2
1,8
0
10
20
30
LOADING HEIGHT IN METRES
33
32
30,5
28,5
44
42
40
37
55
52
49
46
B
C
D
E
Kg
165
175
150
8
165
175
150
9
165
175
150
10
9
2,4
3,0
3,6
4,2
4,8
40
50
60
70
80
26
23
19,5
15,5
11
34
30
25,5 20,5
15
42
38
33
27
20,5 13,5
ENG
5,4
6
90
100
9
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mp80Mp100Mp120

Tabla de contenido