Operating Procedure - Stanley ProSert XTN20 Manual De Instrucciones

Ocultar thumbs Ver también para ProSert XTN20:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Operating Procedure

Installing a Blind Rivet Nut (see Fig. 3).
To install a Blind Rivet Nut.
Check that the correct Blind Rivet Nut has been selected.
Push Blind Rivet Nut into the application.
Check Nose Assembly is at right angle (90°) to the work.
Push onto the Blind Rivet Nut with the tool to spin on.
Once fully and correctly inserted, depress tool Trigger 20 switch to start installation cycle.
Hold the Trigger 20 until the Blind Rivet Nut is completely set and the tool has disengaged completely.
In the event a Blind Rivet Nut becomes jammed in an application press the Manual Reverse Trigger 17 to
reverse the Mandrel 1 and spin off the Blind Rivet Nut. Alternately disconnect from the air supply and use the
4mm Pin Punch 21 supplied in the Maintenance Kit to wind off the Mandrel through the Nose Casing 4 shown
in the figure 1.
CAUTION - do not attempt to force the installation of an insert as this will cause damage to the tool and/or
application.
E N G L I S H
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

74202

Tabla de contenido