Power Supply; Loading Plc Programs; Starting The Sequence - Festo 8097522 Instructions De Service

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MPS
Industry 4.0 upgrade kit
®

11.6 Power supply

The stations are supplied with 24 V DC voltage via a power pack (3 x 24 V, DC 4 A, for each ≤ 100 W
power output, SELV/PELV energy-restricted power packs (LPS)).
The entire station is supplied with electrical power from the rack PLC.

11.7 Loading PLC programs

Proceed as described in the user's manuals for the programming software you are using in order to load the
PLC programs.
Current PLC programs for various controllers can be found on the Internet at the following website:
www.festo-didactic.com > Services > MPS

11.8 Starting the sequence

1. Check the power supply and compressed air supply.
2. Before resetting, manually remove the workpieces from the module and station transfer points.
3. Carry out the resetting procedure. The resetting procedure is prompted by the blinking RESET button
and is executed after the button has been pressed.
4. Start the sequence of the stations. Start-up is prompted by the illuminated START key and is executed
after the key has been pressed.
Notes
The sequence can be stopped at any time by pressing the emergency stop button or
the STOP button.
The following applies when several stations are combined:
The individual stations are aligned in the order opposite the direction of material flow.
64
®
The Modular Production System > Stations
© Festo Didactic 8097301

Publicidad

Tabla de contenido
loading

Tabla de contenido