3.2
Step 1
Approx. 60mm
For "L1" , "L2","L3"and "N"
10 mm
L1
Approx. 63mm
Insert the conductor into a suitable ferrule
Unscrew the swivel nut from
the threaded sleeve,
acc. to DIN 46228-4 and crimp.
then thread the swivel nut and
Insert the crimped conductors, L, N and PE
threaded sleeve over
into corresponding terminals and tighten
the AC cable
the screws (torque 0.6±0.1N·m).
3.3
DC Wire Assembly and Connection
1)
Note: According to AS/NZS 5033, PV arrays for installation on domestic
dwellings shall not have PV array maximum voltages greater than 600V.
Step 1
Step 2
Assemble the cable ends
7mm
7mm
Step 4
Step 5
3.4
Wi-Fi/GPRS Connection (Optional)
The stick is included in the scope of delivery as an option.
3.4.1 Tighten the stick into the COM1 port. Make sure the stick is
securely connected.
3.4.2 For the connection and configuration of the stick please refer to
<Wi-Fi stick User manual> or <GPRS stick User manual>.
Step 2
Step 3
N
PE
2
L3
L2
Assemble the locking cap,
Screw the AC connector and
threaded sleeve and swivel
tighten firmly into socket.
nut together.
Step 3
Assemble the connectors
Positive terminal
2.6-2.9 N·m
Negative terminal
Step 6
3.5
RS485/Smart Meter/DRED Connection
Position
COM1:RS485
1
COM2:METER/DRED
Insert the crimped conductors accordingly into their corresponding terminals and tighten the screws use the screwdriver in the attached bag.
Positive
Negative
4.
Commissioning
click
click
1
EAS ELECTRIC SMART TECHNOLOGY, S.L.
2
Address: P.I. Codonyers, C/Principal, 4 46220 Picassent (Valencia, SPAIN)
Step 1
R 485 FOR COM1
S
METER OR DRED FOR COM2
Power +
PIN 1
RS485 A
PIN2
Power -
PIN2
RS485 B
PIN3
COM LOAD/0
PIN1
RS485 A
PIN3
RS485 B
PIN4
REF GEN/0
PIN4
www.easelectric.es