Descargar Imprimir esta página

EdilKamin COCLEA Instalación página 13

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20
SCREW FEEDER 500 cm
List of components:
A = pipe with hollow part L= 1.0 m
B = curve
C = straight element L= 1.5 m
D = straight element L= 1.0 m
G = flexible pipe connection flange
H = flexible pipe
Q = gear motor unit
Z = collar for suspension (optional - code 748060)
STEP 1:
• Secure the pipe (A) with the hollow part (*), facing upwards, to
the curved pipe (B) using the M6X20 screws and M6 nuts supplied.
• Position and secure the collar (W) to the pipe (A) at 120 -
140 mm from the joining point of A and B.
STEP 2:
• Fix the 1.5 m pipe (C) to the pipes (A + B), previously assem-
bled using the M6X20 screws and M6 nuts supplied.
STEP 3:
• Fix the two 1m pipes (D) to the pipes (A + B+ C), previously
assembled using the M6X20 screws and M6 nuts supplied.
STEP 4:
• Slip the flexible spiral (**)already cabled to the gear motor unit
(Q), inside the pipes (A + B + C + D) previously assembled, until
the flange of pipe D is coupled with that of the gear motor unit.
STEP 5:
• Complete the operation by securing the gear motor unit (Q) to
the pipes (A + B + C + D) using the M6X20 screws and the M6
nuts supplied.
STEP 6:
• Secure the flexible pipe connection flange (G) and the flexible
pipe (H) to the boiler as indicated on the technical data sheets
of the hoppers.
STEP 7:
• Represents the screw feederassembled from the external
hopper to the boiler.
STEP 8:
• Suspend the screw feeder from the ceiling using the optional
collars (code 748060) levises supplied.
STEP 8
Z
STEP 7
INSTALLATION
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
STEP 6
- 13
-
B
W
A
*
B
A
C
B
A
C
B
A
C
B
A
W
C
D
D
**
Q
D
D
Q
D
D
H
G

Publicidad

loading