At a glance.
1 Grinding belt tensioning device (GI75/GI150)
2 Cover/stop (GI75/GI150)
3 Spark guard (GI75/GI150)
4 Star-knob bolt, chip/grinding-dust box
(GI75/GI150)
5 Grinding rest (GI75/GI150)
6 Dust collector (GI75/GI150)
7 Lever for tilting device (GI75/GI150)
8 Side cover (GI75/GI150)
9 Eccentric clips GIC
10 Eccentric lever
11 Mounting bolts
12 Brake-wheel drive motor
13 Clamping lever for brake-wheel parallelism
14 Connection socket
15 Basin with container
16 Handle
17 Adjustable feet
18 Lever for applying brake wheel against the
workpiece
19 Brake wheel
20 Clamping lever
21 Clamping lever for brake-wheel clearance
22 Crank for adjusting the feed pressure
23 Screw for guide-rail adjustment
24 Guide rail
25 Gap opening
26 Clamping lever
27 Coolant hose with nozzle
28 Shut-off valve
29 Magnetic holder
30 On/off switch for coolant pump
31 Drain hose for coolant return
32 Coolant tank
Assembly instructions (figures 1–3).
Belt grinder GI75/GI150.
Before any work on the machine itself, pull the
mains plug.
Dismount the spark guard (3).
Dismount the grinding rest (5), the chip/grinding-dust
box (6) and the star-knob bolt (4).
Open side cover (8).
Loosen the tensioning device (1) and remove the grind-
ing belt.
Shut the side cover.
Loosen the lever of tilting device (7) and set the belt
grinder to a horizontal position.
Cylindrical grinding device GIC.
Remove the unit from its packaging and fit the accesso-
ries as described in the data sheet.
Position the cylindrical grinding device against the belt
grinder and align the drill holes of the screws (11).
Connect both machines by fastening the two eccentric
clips (9) with the 4 bolts (11) and then tightening with
the eccentric lever (10). Tighten clamping lever (20) as
well as the bolt with the nut.
Connect the power cable at the connecting point
of the switch of the belt grinder GI75/GI150.
Coolant unit GXW (figures 3+4).
Position the tank on the base plate of the cylindrical
grinding device.
Fill approx. 30–35 liters of coolant into the coolant
tank.
Place the lid with the pump unit onto the tank and
mount the drain hose (31) to the connection sleeve of
the tank (15).
Mount the coolant hose (27) to the cylindrical grinding
device.
The coolant hose must be mounted in such a
manner that the brake wheel or workpiece can-
not catch hold of it.
Plug the plug of the coolant unit into socket outlet (14).
Mounting/replacing the grinding belt.
Before any work on the machine itself, pull the
mains plug.
Loosen the tensioning device (1) and mount a
75 x 2000/150 x 2000 mm long grinding belt.
The running-direction marking of the grinding
belt must correspond with the rotation direction.
Tension the grinding belt with the tensioning device (1).
Move the grinding belt manually and observe, if it
moves off towards the left or right of the contact roller.
Adjust the guidance of the drive wheel on the belt
grinder such that the grinding belt runs centrally. The
exact calibration is carried out while the machine is run-
ning.
Switch the belt grinder on. Check if the contact pulley
rotates in the direction of the arrow.
Switch the belt grinder off again.
If the contact disc rotates in the opposite direc-
tion of the arrow, the motor's direction of rotation
must be changed by a qualified electrician.
Adjusting the guide rail (figures 3A+5).
Before any work on the machine itself, pull the
mains plug.
Loosen both screws (23) and adjust the clearance of the
guide rail to the brake wheel:
– Pipe diameter 10–12 mm: Adjustment according to
figure "1".
– Pipe diameter 10–130 mm: Adjustment according
to figure "2".
Tighten screws (23) again.
Adjusting the brake wheel (figure 3).
Before any work on the machine itself, pull the
mains plug.
Adjusting the parallelism.
Release clamping lever (20) and adjust the brake wheel
(19) with the handle (16) in such a manner that it runs
parallel to the contact pulley when viewed from above.
This helps to achieve a uniform feed pressure and a uni-
form grinding pattern. The optimal setting must be
determined by practical testing.
en
13