Descargar Imprimir esta página

Prepare Range Hood; Mark Hole Locations - Samsung NK30B3000US/AA Guía De Instrucciones Para Instalación

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
4. Using 2 or more people, lift the range hood up under cabinet and
determine final location by centering beneath cabinet. Mark on the
underside of cabinet the location of the 4 keyhole mounting slots on
the range hood (A)
NOTE
Mark the thin area of the slot. On the back wall mark the holes for the
security screws (B). Set range hood aside on a covered surface.
A
A. Keyhole slot
5. Use
" (3 mm) drill bit and drill 4 pilot holes.
1
8
NOTE
Make the drill holes on the thin area of the slot.
A. Drill pilot hole
6. Install the 4 - .45 cm x 1.3 cm mounting screws in pilot holes. Leave
about ¼" (6.4 mm) space between screw heads and cabinet to slide
range hood into place.
7. Use
" (8mm) drill bit and drill 2 pilot holes in the marks for the
8
2 5
security screws, then place the drywall anchors.

Prepare Range Hood

1. Set the range hood on its back on a covered surface.
2. Unscrew and remove junction box cover
8
English
A
1⁄4"
(6.4 mm)
B
3. Using a flat head screwdriver, remove the appropriate power supply
knockout.

Mark Hole Locations

1. Determine and clearly mark a vertical centerline (A) on the wall and
cabinet bottom.
A
To wire through top:
1. Mark a line distance (A) from the right of the centerline on the
underside of the cabinet. Mark the point on this line that is 2" (5.08 cm)
from the rear wall. Drill a
" (2.2 cm) diameter hole (B) through the
7
8
underside of the cabinet at this point.
A. Centerline
A
A A
2"
(5.08 cm)
B
A. 8 2/5" (21.3cm)

Publicidad

loading