Descargar Imprimir esta página

Putting Into Operation; Connecting The Control Leads En - Abicor Binzel MFS-V2 Instructivo De Servicio

Ocultar thumbs Ver también para MFS-V2:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 68

6 Putting into operation

6 Putting into operation
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair work, the following instructions
must be adhered to:
• Switch off the power supply.
• Disconnect the compressed air supply.
• Pull the mains plug.
Risk of injury
Safety switches on covers and protective devices are ineffective in manual mode.
• High concentration.
Danger of crushing
Limbs can be drawn in and crushed.
• Do not reach into moving wheels.
NOTE
• The wire feeding unit may only be put into operation by trained personnel.
6.1 Installation
Select a location that allows a short and rectilinear wire feed.
6.2 Connecting the control leads
Connect the control leads using the following procedure:
1
Interface X41
2
Interface X46
3
Control lead B
4
Control lead X47
Fig. 6
Connecting the control lead
EN - 8
DANGER
DANGER
WARNING
1
2
A
13
12
11
10
5
Interface X48
6
Interface 49
7
Control lead C
3
4
5
6
B
E
C
7
9
8
8
Interface X43
9
E-Box
10 Interface X51
MFS-V2
11 Control lead E
12 M-Drive
13 Control lead A

Publicidad

loading