Descargar Imprimir esta página

Progress Lighting AirPro P250095 Manual De Instalación página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 6. Carefully lift the assembly and rest the
hanger ball of downrod assembly on the hanger
bracket attached to the outlet box. Be sure the
groove in the hanger ball is lined up with the tab
on the hanger bracket. (Fig.8)
Hanger
bracket
Hanger
ball
Tab
Groove
OK
Figure 8
5.
Make the Electric
Connections
WARNING:To avoid possible electrical shock,
be sure electricity is turned off at the main fuse
box before wiring.
WARNING: If you feel you do not have enough
electrical wiring knowledge or experience, have
your fan installed by a licensed electrician.
Step 1. Motor to house supply wires electrical
connections: Connect the black (hot) wire from
the ceiling to the black wire and blue wire from
the motor. Connect the white (neutral) wire from
the ceiling to the white wire from the motor.
(Fig.9) Secure all wire connections with the
plastic wire nuts provided.
NO
AV 120V
Figure 9
Green ground
Wiring
box
Ground to
mounting
bracket
and downrod

Publicidad

loading