Descargar Imprimir esta página

Fromm & Starck STAR ATFE 12 Manual De Instrucciones página 27

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 92
Step 4:
VII. Connect all cables to the sockets in the control box (11):
connect the signal cable from the control panel to the socket (G1),
connect the power cord to the socket (G2),
connect the signal cable from the lifting column to the socket (G3).
Step 5:
VIII. Install the desk top, the control box (11) and the control panel (11).
IX. If an extension of the crossbeam is required, proceed as follows:
loosen (L),
move (P),
tighten (T).
X. Attach the desktop with screws (E), install the control box (10) with screws (E),
then install the control panel (11) with screws (14).

Publicidad

loading