Descargar Imprimir esta página

Weinmann CPAP 20e Descripción Del Aparato E Instrucciones De Manejo página 6

Ocultar thumbs Ver también para CPAP 20e:

Publicidad

Idiomas disponibles

Idiomas disponibles

CLICK 2 (optional)
26 Filling cap
27 Upper part
28 Outlet
connections
29 Lower part
30 Closures
Legend
26 Filling cap
For filling the humidifier.
27 Upper part
Closes the humidifier, contains the filling cap.
28 Outlet connections
From here the moistened air flows into the
breathing hose.
29 Lower part
Contains approximately 280 ml water.
6
Overview
32 Inlet connections
30 Closures
Used to shut off the pressure gland during
preparatory hygienic operations.
31 Heater
Heats the water in the humidifier. This humidifies
the air.
32 Inlet connections
The air flows from the therapy unit into the
humidifier.
33 Bellows
Dries the CLICK 2.
31 Heater
33 Bellows

Publicidad

loading

Este manual también es adecuado para:

Click 2Wm 27320Wm 27330